Tailings Dam Remediation

Project number
26058
Organization
UA Department of Mining and Geological Engineering
Offering
ENGR498-F2025-S2026
The senior design team will work with BHP, to develop a tailings storage facility remediation design based on a Technical Design Package prepared from GISTM public disclosures and recent project documentation. The package includes site layouts, borehole and CPT logs, interpreted cross-sections, and design/loading criteria. Students will begin by preparing a technical proposal using publicly available information, and upon sponsor approval, will receive the full design package.

Get started and sponsor a project now!

UA engineering students are ready to take your project from concept to reality.