Project number
27088
Organization
Dragoon Brewing
Offering
ENGR498-F2026-S2027
Dragoon purchased and installed a CO2 recapture system 5 years ago. Since then, they experienced several compressor failures and other issues. Assess the system and propose an updated design to improve the reliability of system. Depending on the workload of the CO2 system, the team may also perform a COGS analysis to assess loss and waste in the Dragoon system and propose improvements to reduce loss and waste.