Project number
23109
Organization
UA Department of Chemical and Environmental Engineering
Academic year
2022-2023
Design a Liquefied Natural Gas (LNG) receiving terminal to be sited in the Gulf Coast. The unloading and tankage will be designed to off-load LNG from 125,000 m3 LNG ships. The nominal sendout capacity of the receiving terminal will be 1,050 MMSCF/D measured at the ship’s rail. After vaporization Natural Gas will be delivered to the pipeline at 1,250 psig and 40°F.