SME Metallic Student Design Competition, 2023-2024, Deep Rock Geologic

Project number: 
24074
Sponsor: 
UA Department of Mining and Geological Engineering
Academic year: 
2023-2024
The Metallic Design Team will prepare an Order of Magnitude report as identified in the Scope of Work. The Metallic Design Competition has one guaranteed deliverable with a second deliverable potentially due upon favorable evaluation from the first deliverable. We will refer to the first deliverable as Phase 1 (the Order of Magnitude Study) and Phase 2 (a second project building on the terms of the first deliverable). Phase 1 will begin on September 30th, 2023 and
will last 21 days before concluding on October 21st, 2023.